Stormwater from an uphill property was washing away soil along and beneath a concrete driveway in Buford, GA. Over approximately 15 working days, Schmitt Waterproofing built a 190-foot segmental retaining wall, a 200-foot riprap dry creek bed, and an underground stormwater drainage system. The work also included a separate footing drain behind the wall, two stormwater collection drains, and sod restoration. We returned after rainfall to see how the system was handling runoff.
| Project Details | |
|---|---|
| Location | Buford, GA |
| Project Date | July 13, 2026 – July 31, 2026 |
| Duration | Approximately 3 weeks / 15 working days |
| Project Type | Erosion Control, Retaining Wall, Dry Creek Bed, Drainage System |
| Lead | Josh Schmitt, Schmitt Waterproofing, LLC |
Project Overview
The home was built in 2021, but runoff from the higher property was already causing significant erosion. During heavy rain, water moved downhill across the yard and concentrated alongside the driveway. The homeowner was concerned about the loss of soil along the pavement and beneath portions of the drive.
The work started with tracing where water entered the property, how it traveled across the slope, and where it could discharge. That gave us a route for the surface runoff and helped determine where the retaining wall, collection drains, and underground piping needed to go. Buford yard drainage services
The Challenge
The project had three distinct drainage and erosion problems. Runoff from uphill needed to be intercepted before it scattered across the slope. The hillside beside the driveway needed support where soil had washed away. The new retaining wall also needed drainage behind it so water could leave the retained soil.
Once collected, the surface runoff needed a route through the property to a designated discharge point. The work required excavation along the driveway and across portions of the lawn, so we also planned equipment routes and turf restoration. How to stop yard erosion before it damages your home
Our Solution
200-Foot Riprap Dry Creek Bed
We excavated and shaped approximately 200 linear feet of dry creek bed along the uphill side of the new retaining wall. We installed heavy-duty fabric beneath the channel, reused stone already on the property where practical, and brought in approximately four additional tons of riprap.
The rock-lined channel gives uphill runoff a defined path along the slope. At the end of the retaining wall, the channel feeds a 24-inch collection basin that connects to the underground stormwater system. Dry creek bed installation
190-Foot Segmental Retaining Wall
We excavated along the driveway and built approximately 190 feet of segmental block retaining wall. The wall reaches about three feet in its main section and tapers back to grade at both ends. Construction used approximately 13 pallets of Belgard Diamond Pro Air block and 140 wall caps.
The wall supports the hillside beside the driveway and provides a defined lower edge for the dry creek bed. The channel above the wall intercepts surface runoff, while the drainage system behind the wall handles water within the retained soil. Retaining wall construction in Buford
Drainage Behind the Retaining Wall
We installed approximately 200 linear feet of perforated footing drain behind the wall, surrounded by approximately 18 tons of drainage gravel. Filter fabric separates the drainage gravel from the surrounding soil.
We also installed five drainage emitters through the face of the wall. The footing drain, gravel, filter fabric, and emitters give water a path out of the retained soil, helping reduce pressure behind the wall. If an existing wall is bulging, leaning, or cracking, see our guide to the common signs of retaining wall failure.
Large-Capacity Underground Stormwater Drainage
We installed approximately 200 linear feet of 8-inch solid SDR-35 pipe to carry collected stormwater through the property. The larger mainline was selected for the volume of water reaching the site from uphill.
The 24-inch basin collects runoff from the dry creek bed. A separate 18-inch drain with a riprap surround collects surface water in the front yard. The underground system carries the water collected at these inlets to the designated discharge point.
Site Protection and Lawn Restoration
We used ground protection mats along equipment routes while moving excavators, skid steers, materials, and equipment across the property. Where trenching crossed existing turf, we lifted the sod with a sod cutter and reinstalled it where conditions allowed.
After completing the wall and drainage work, we installed approximately two pallets of TifTuf Bermuda sod in disturbed areas, including the space between the new retaining wall and the driveway.
The Results
The project was completed on schedule in approximately 15 working days. The retaining wall supports the hillside beside the driveway. The dry creek bed intercepts runoff from uphill, the 24-inch and 18-inch drains collect surface water, and the 8-inch underground mainline carries it to the discharge point. The separate footing drain and wall-face emitters provide a route for water behind the retaining wall.
Follow-Up After Rain
We returned on August 19, 2026, after rainfall to check how the system was working. We confirmed that the dry creek bed was delivering uphill runoff to the collection basin and that the underground system was carrying the collected water to the designated discharge point.
Dealing with driveway erosion or runoff on your Buford property? Request a free estimate for drainage or retaining wall work.