Case Study: Large-Scale Erosion Control, Retaining Wall and Drainage System in Buford, GA

Table of Contents

Stormwater from an uphill property was washing away soil along and beneath a concrete driveway in Buford, GA. Over approximately 15 working days, Schmitt Waterproofing built a 190-foot segmental retaining wall, a 200-foot riprap dry creek bed, and an underground stormwater drainage system. The work also included a separate footing drain behind the wall, two stormwater collection drains, and sod restoration. We returned after rainfall to see how the system was handling runoff.

Project Details
LocationBuford, GA
Project DateJuly 13, 2026 – July 31, 2026
DurationApproximately 3 weeks / 15 working days
Project TypeErosion Control, Retaining Wall, Dry Creek Bed, Drainage System
LeadJosh Schmitt, Schmitt Waterproofing, LLC

Project Overview

Uncapped retaining wall blocks between the concrete driveway and wooded slope Open block cores along the retaining wall beside the sloping driveway and wood fence Curving segmental block wall beside the lower driveway with the uphill bank behind it

The home was built in 2021, but runoff from the higher property was already causing significant erosion. During heavy rain, water moved downhill across the yard and concentrated alongside the driveway. The homeowner was concerned about the loss of soil along the pavement and beneath portions of the drive.

The work started with tracing where water entered the property, how it traveled across the slope, and where it could discharge. That gave us a route for the surface runoff and helped determine where the retaining wall, collection drains, and underground piping needed to go. Buford yard drainage services

The Challenge

The project had three distinct drainage and erosion problems. Runoff from uphill needed to be intercepted before it scattered across the slope. The hillside beside the driveway needed support where soil had washed away. The new retaining wall also needed drainage behind it so water could leave the retained soil.

Once collected, the surface runoff needed a route through the property to a designated discharge point. The work required excavation along the driveway and across portions of the lawn, so we also planned equipment routes and turf restoration. How to stop yard erosion before it damages your home

Our Solution

200-Foot Riprap Dry Creek Bed

Angular riprap lining the channel between the retaining wall and exposed hillside Black underlayment spread over the uphill channel beside uncapped wall blocks Rock-lined dry creek bed uphill of the segmental wall beside the driveway

We excavated and shaped approximately 200 linear feet of dry creek bed along the uphill side of the new retaining wall. We installed heavy-duty fabric beneath the channel, reused stone already on the property where practical, and brought in approximately four additional tons of riprap.

The rock-lined channel gives uphill runoff a defined path along the slope. At the end of the retaining wall, the channel feeds a 24-inch collection basin that connects to the underground stormwater system. Dry creek bed installation

190-Foot Segmental Retaining Wall

Capped segmental block retaining wall extending along the concrete drive Finished block retaining wall on one side of the concrete driveway and wood fence on the other Skid steer on the concrete drive beside the wall and excavated slope

We excavated along the driveway and built approximately 190 feet of segmental block retaining wall. The wall reaches about three feet in its main section and tapers back to grade at both ends. Construction used approximately 13 pallets of Belgard Diamond Pro Air block and 140 wall caps.

The wall supports the hillside beside the driveway and provides a defined lower edge for the dry creek bed. The channel above the wall intercepts surface runoff, while the drainage system behind the wall handles water within the retained soil. Retaining wall construction in Buford

Drainage Behind the Retaining Wall

Black drainage fabric between the uphill slope and uncapped retaining wall blocks Open retaining wall blocks beside exposed soil and drainage backfill Black fabric and stone behind the retaining wall with equipment on the driveway

We installed approximately 200 linear feet of perforated footing drain behind the wall, surrounded by approximately 18 tons of drainage gravel. Filter fabric separates the drainage gravel from the surrounding soil.

We also installed five drainage emitters through the face of the wall. The footing drain, gravel, filter fabric, and emitters give water a path out of the retained soil, helping reduce pressure behind the wall. If an existing wall is bulging, leaning, or cracking, see our guide to the common signs of retaining wall failure.

Large-Capacity Underground Stormwater Drainage

Green stormwater pipe in an open trench with a skid steer nearby Green drainage pipe in a trench between a wooded bank and the lawn Green drainage pipe laid in a lawn trench beside a skid steer Excavator beside an open drainage trench running alongside the driveway

We installed approximately 200 linear feet of 8-inch solid SDR-35 pipe to carry collected stormwater through the property. The larger mainline was selected for the volume of water reaching the site from uphill.

The 24-inch basin collects runoff from the dry creek bed. A separate 18-inch drain with a riprap surround collects surface water in the front yard. The underground system carries the water collected at these inlets to the designated discharge point.

Site Protection and Lawn Restoration

We used ground protection mats along equipment routes while moving excavators, skid steers, materials, and equipment across the property. Where trenching crossed existing turf, we lifted the sod with a sod cutter and reinstalled it where conditions allowed.

After completing the wall and drainage work, we installed approximately two pallets of TifTuf Bermuda sod in disturbed areas, including the space between the new retaining wall and the driveway.

The Results

The project was completed on schedule in approximately 15 working days. The retaining wall supports the hillside beside the driveway. The dry creek bed intercepts runoff from uphill, the 24-inch and 18-inch drains collect surface water, and the 8-inch underground mainline carries it to the discharge point. The separate footing drain and wall-face emitters provide a route for water behind the retaining wall.

Follow-Up After Rain

We returned on August 19, 2026, after rainfall to check how the system was working. We confirmed that the dry creek bed was delivering uphill runoff to the collection basin and that the underground system was carrying the collected water to the designated discharge point.

Dealing with driveway erosion or runoff on your Buford property? Request a free estimate for drainage or retaining wall work.

Picture of Josh Schmitt | Founder and Operator
Josh Schmitt | Founder and Operator

Josh Schmitt is the founder of Schmitt Waterproofing and an Emecole Certified Contractor and NDS Professional Drainage Contractor. Since 2017, he has helped North Georgia homeowners solve basement waterproofing, foundation drainage, crawl space moisture, and stormwater management issues. Josh personally evaluates projects and remains actively involved in installations throughout the Atlanta metro area.